­
Back To Category
0220 Ravine Lots - Structure Structural Foundation - Problems
 
0220 Ravine Lots - Structure Structural Foundation - Problems -

Image Text: Watch for cracks in side walls due to soil movement > bent tree trunks can indicate soil slippage > the maximum slope for a lot should be 1 in 2 > vegetation helps reduce erosion from rain runoff and improves the stability of the top soil layer > water at the bottom of the slope can erode the soil, leading to increased slope instability > water

Powered by Phoca Gallery

STRUCTURE, Footings and Foundations, Description, Problems, Floors, Sills, Columns, Beams, Joists, Subflooring, Concrete Floor Slabs, Walls, Solid Masonry Walls, Wood Frame Walls, Masonry Veneer Walls, Arches and Lintels, Roof Framing, Rafters, Roof Joists and Ceiling Joists, Collar Ties, Knee Walls and Purlins, Trusses, Wood I Joists, Sheathing

­